(Art. 335.1 LEC – Official Judicial Expertise)
Record:[Procedure number / Internal reference]
Inspection dateon-site:[dd/mm/yyyy]
Report issue date:[dd/mm/yyyy]
Appointed/party expert:[Name, ID, member number if applicable]
Name of expert: Aurelio Tamarit Blay
DNI:[XXXXXXXX-X]
Member no.:[Ex. No. COAAT-XXXXX / not mandatory for party experts]
Accredited qualification:Technical Engineer of Public Works (ETS of Civil Engineers, Canals and Ports).
Specialty: Judicial Expertise in Construction, Real Estate and Naval.
Contact:clients@aureliotamarit.es | +34 662 221 582
Professional address:[Address in Valencia, with RGPD applied]
🔹 I. BACKGROUND AND PURPOSE OF THE REPORT
In compliance with the order made by[Name of client / Lawyer / Court], and in accordance with the provisions of articles 335 et seq. of the Civil Procedure Law, this document is issuedindependent technical expert report, in order to:
Diagnose the origin and mechanism of the humidity observed in the single-family home located in [anonymized address: “residential area, Benidorm, Alicante”],
determine if its cause is attributable to construction defects, lack of maintenance or external factors,
and evaluate compliance with current technical regulations (CTE, EHE-08, ITC-01).
🔹 II. METHODOLOGY USED
A protocol has been followed based on:
- Visual inspectionon-site(day [date], time [time], weather conditions: [raining / dry / 48h without rain])
- Measurement with calibrated equipment (annual certificates, no. [XXX]):
- FLIR E8-XT thermocamera (resolution 320×240, precision ±2 °C)
- Gann GMH 3810 Resistance Hygrometer (range 0–100% RH, accuracy ±2%)
- HD industrial rigid endoscope with recording (Ø 6 mm, length 1 m)
- Document analysis: basic distribution plans (provided by property), deed of new construction (if applicable), repair history.
- Applied regulations:
- CTE DB-HS 3: Protection against humidity
- EHE-08, art. 32.4: Durability in elements exposed to environmental agents
- ITC-01 of the CTE: Pathologies due to differential movements
- UNE-EN 13183-1:2002: Moisture measurement in wood and porous materials
- RD 235/2013: Energy Efficiency Certificate (relation to pathologies)
🔹 III. PROVEN FACTSON SITE
| Inspected item | Technical finding | objective test |
|---|---|---|
| Attached party wall (NS) | Double sheet of hollow brick without ventilated chamber or vapor barrier | Endoscopy: water accumulated in the interleaf (attached video, min 2:15) |
| Upper crowning | Cracked mortar, lack of water-repellent finish | Georeferenced photography + GPS (lat/lon) |
| Leaking area (living room) | Surface humidity in plaster > 25% RH | Measurement with hygrometer (record: 26.3% at point A, 28.1% at point B) |
| Adjacent vertical wall | Abnormal thermal pattern (difference ≥ 6 °C vs. ambient) | Thermogram (attached): blue zone (8.2 °C) on a background of 16.4 °C |
| Bottom slab (slab) | Efflorescence stains and coating peeling | Visual sample + macroscopic analysis of soluble salts |
✅Preliminary conclusion: The water does not come from the roof or from installations, but ratherpenetrates through the deficient crown and travels horizontally within the wall, filtering into the forging by capillarity.
🔹 IV. TECHNICAL ANALYSIS-FORGENSE
A. Failure mechanism
- Phase 1 – Entry: Rainwater penetrates through cracks in the crown (absence of elastic joint).
- Phase 2 – Transportation: The water descends by capillarity in the core of the double sheet wall (absence of water-repellent barrier → violationCTE DB-HS 3.2).
- Phase 3 – Lateral diffusion: Upon reaching the slab (critical construction node), the water spreads horizontally across the plaster-slab interface.
- Phase 4 – Manifestation: Visible leaks in ceiling + stains on vertical wall → symptomsnon-gravitational descenders.
B. Technical responsibility (according to jurisprudential doctrine)
- STS 456/2022: “The mere existence of moisture does not imply liability, but it does when a construction defect is demonstrated that violates mandatory regulations”.
- In this case,three objective breaches converge:
- Lack of water-repellent finish (CTE DB-HS 3)
- Absence of moisture barrier on walls in contact with the ground/open air (EHE-08 Art. 32.4)
- Cracks due to unforeseen movements (ITC-01)
→ Pre-existing cause of writingif the work is <10 years (ten-year term, art. 1,591 CC).
🔹 V. EXPERT CONCLUSIONS (Art. 340.2 LEC)
- ✅The origin of the humidity is a serious construction deficiency in the party wall, not attributable to lack of reasonable use or maintenance by the owner.
- ✅The filtration mechanism is validated by objective tests(thermography, hygrometry, endoscopy), documented and dated.
- ✅The solution is through structural intervention, non-palliative: crown sealing, water-repellent injection and passive ventilation.
- ✅The report meets the formal requirements of art. 340 LEC: signature, identification of the expert, methodology, proven facts and reasoned conclusions.
🔹 VI. INTERVENTION PROPOSAL (Optional – for mediation or execution)
| Performance | Reference standard | Estimated term |
|---|---|---|
| Crown sealing with type II water-repellent mortar + silicone joint | CTE DB-HS 3.2 | 2 days |
| Microinjection of flexible acrylic resin (pressure 15–20 bar) | UNE 41790:2020 | 1 day |
| Upper passive ventilation (grid Ø 80 mm) | DB-HE 1 (air renewal) | 0.5 days |
| Removal of affected coatings + anti-fungal treatment | Royal Decree 163/2009 (biological risks) | 2 days |
Indicative estimated cost (without VAT): €3,800–4,500 (depending on accessibility).
Note: quote closed after detailed measurement.
🔹 VII. ATTACHED DOCUMENTATION (Annexes)
- Annex 1: Georeferenced and dated photographs (12 images)
- Annex 2: Infrared thermograms with temperature scale and legend
- Annex 3: Hygrometry records (signed and with calibrated equipment number)
- Annex 4: Video capture of the endoscope (min 1:45–3:20, critical zone)
- Annex 5: Technical sketch of the pathology (1:50 scale, with dimensions and details)
- Annex 6: Equipment calibration certificates (current)
- Annex 7: Photocopy of the DNI and certification of the expert
🔹 VIII. DECLARATION OF IMPARTIALITY AND CONFIDENTIALITY
The undersigned declares under his/her responsibility that:
- He has no personal, professional or economic relationship with any of the parties involved.
- This report is issued withtechnical independence and objectivity, without external influence.
- The data processed complies with theGDPR (EU 2016/679) and the Organic Law 3/2018.
- The report is delivered underprofessional secret(art. 24 LEC and art. 540 LECrim if applicable).
🔹 IX. SIGNATURE OF THE EXPERT
“In [City], on [date], being [time] hours, I proceed to sign this expert report as a sign of agreement with its contents.”
| handwritten signature |  |
| Name: | Aurelio Tamarit Blay |
| DNI: | [XXXXXXXX-X] |
| Qualified electronic signature (optional): | eIDAS-QES-[hash SHA-256][Certificado FNMT / ACCV] |